Analysing the project delay causes and how global construction companies assessment answers
Subject Name : Dissertation
Introduction
The construction companies can be stated as one of the factors where there are some of the main sectors which provide the important ingredient for the development of the economy. However, there are a lot of projects where it can be witnessed that there are some of the extensive delays which are occurring about thereby exceeding some of the initial time and also for estimating about the costs (Adam et al., 2017). The construction companies are believed to be large, volatile and which also requires tremendous capital outlays. There are some of the companies as well which require tremendous and capital outlays for developing the economies in the construction industry. The construction industry is said to be as a tool which will be achieved by the society for achieving the development of the economy. The cost for the construction project can be considered to be as one of the most important factors in the construction industry and due to this there are many of the reasons which will be responsible for providing the ingredients for the development in the economy (Jusoh amp Kasim, 2017).
The construction companies can be defined with the accordance of the activities which are formed by the allied construction companies for them to replace with the division of the structure of the processes that can be based on the general construction for building and construction of the entire dwellings, buildings that can be categorised for office and also for the other stores which can be used for the building of utility (Bekr, 2015). There are some of the different divisions for the construction companies as well which can suggest about the structures of the site which can also require some of the other specialised skills about the repair construction for it to include with the some of the other unique skills in carrying out the aspects about the installation of all the other kinds of the finishing of the work. However, there are some of the issues which suggest about the factors where there can be the delay in those particular projects and can also be used for the global construction companies for the coping of the other construction companies for the same (McCord et al., 2015).
Background of the research
The background for the research can be state for analysing the factors which can also be used for the delay in the project for construction companies in order to deal with those issues. The background for this research can be of the form where we can also evaluate the causes due to which there are some of the responsibilities for causing the delays based due to the project (Bagaya amp Song, 2016). The government is also said to be significantly involved in the construction of the roads, dams and also with the airport runways. It is also believed that there are some of the delays which can be seen in the government projects than those for the private individuals (Santoso amp Soeng, 2016). There are some of the results and procedures which are involved in the construction of the projects for the government to start and finish on time. In this research, there will be an analysis in the construction projects by determining the brief overview of the construction companies in order to understand the delays and its causes. There are some of the delays which can be seen which will have a significant impact on the activities of the economy in the country (Keane amp Caletka, 2016). There are several factors which can be the primary cause for the delay and it has also been identified by the researchers being in the field of management of the project where it can be seen that for the construction industry there will be some of the researchers who will have an attempt for the categorisation based on the form of delays which will also be based on the researchers for attempting and categorising the causes of delay based on the various different factors in the field of construction industry. There are some of the explanation which is based as per the causes of delays for the construction projects to be used as per the causes of delays in the construction projects for the several countries (Burr, 2016). There are numerous studies that have been conducted as per the delay in the construction projects for several decades and it comprises of the fact where there is a categorisation about the factors that can contribute to the cause of the delays (Larsen, Lowe, Nagata amp Manginelli, 2017). There are also some of the factors which can be seen for the available literature which indicates about the various factors which is based as per the categories which can define the functioning about the broad categories for explaining based on reiterating the factors for causing and creating the minor prevalence as persuading stakeholders for being pervasive in nature (Trauner, Lowe, Nagata amp Manginelli, 2017). There also are a number of studies which can be used for conducting about the regard of the delays for making it as a cluster for the indication of categorisation based on the groups which are related with the causing of delays. The literature review which are being generated about the construction industry for the identification of the several factors which can as a result use and conclude about the studies that are being supervised with the critical impacts based on the related group about the delays (Buvik amp Rolfsen, 2015). There are some of the identifications which are done on the basis of design work which can also be used as inadequate site inspections based on the causes of consultants for the related delays. The factors which can be seen about the delaying of the design documents and also for the inadequate design team for matching up with the experience and mistakes which contribute about the inadequate design teams for the mistakes and discrepancies in the documents for its designing (Ajayi et al., 2015). There are numerous reasons which cause delay and it can be seen that for carrying out the key critical dimensions there are some of the assessing of the order for the relative contributions for the scheduled delays in the construction industry. Construction is said to be as an everlasting activity across the globe and in the same manner it can also be seen that for the construction industry there are some of the global phenomenon which provides the responsible delay about construction. It can also be seen that for it to vary along with reducing it to minimum there are some of the causes that can be identified based on considering it with the study of some of the major causes and effects for delay it can also be seen that the term delay can refer to the happenings of some of the things. They are related and planned for it to become specific and can also show the timely delivery of the projects where there are some of the investigations based as per representing the areas of construction about the development and the observations of the on-going project which are there about any of the relevant study (Hughes, Champion amp Murdoch, 2015).
Types of delay
There are some other kind of delay that have been put in the construction projects in the form of various classifications which can be elaborated as per the arguments which define about the various processes whether delaying it as critical or non-critical and even excusable and non-excusable for it to compensate and non-compensate (Bilal et al., 2016). The another category which can be formed along with this can be categorised with being concurrent or non-concurrent.
The critical delays can be stated as the delays which can be critical with the form of referring it with the controlling of the item for work and it comprises mainly of three main adjectives and they can be calculated with (Santorella, 2017)
Calculating the completing date of the project
Identifying the extent for the activity in the schedule comprising of delays of the project
Identifying the activities where there are schedules having a higher risk for it to affect with the completion of the project.
There are some of the projects which can be seen for the estimation of the date of project for it to use with the critical path method for it to be used with the high risks of the start and finish of the projects which can be seen for the estimation of the project as creating with the factors that can also be used with the help of following factors which can be stated with (Seymour, 2019)
The project
There are some of the contractors for the planning and the schedule
The requirements for the contracts where there are sequence and phasing
The physical constraints of the project for the building of the job from another perspective where there can also be some of the delays for creating a significant impact for the progress of the work.
There is another type of delay as well which is seen and is given the name of excusable delay which can be identified for the unforeseeable event which can be used beyond the contractors for the standalone delay classification. There are some of the study areas which can be used for representing about the area of rapid construction for the development about addressing of this study (Iqbal et al., 2015).
Objectives of the research
The main key objectives of the research for this particular kind of work can be defined and specified as follows
To obtain an overview about the construction companies
To understand the delays and the main causes for the same
To analyse the issues and what are the certain delays in the project
To develop the solutions which are there and how to deal with them
Research QuestionsThe research questions that have been constructed on the basis of the objectives of the research are as mentioned as under
What is the contribution of construction companies in the economy of the country
What are the major issues that are faced by the construction companies
How are the construction companies influenced due to delay
What are the solutions that can avoid the issues in the construction companies
Structure of the studyThe entire research for this dissertation based on the research proposal will be based and will be categorised mainly into five different categories and they are as mentioned as under
Introduction
Literature review
Research Methodology
Data analysis and discussions
Conclusions
Recommendations
Research RationaleThe construction industry plays an important role in each and every aspect as it also contributes to the development of the nation by improving the GDP for it to contribute along with the economy for building an environment based on the construction industry. However, there are some of the delays which occur in the construction industries for analysing the scope and the initiatives based and focused for designing and implementing the management ideas. The construction companies can also be seen as some of the issues that can be discussed along with the factors and the causes for it to consider with the issues of research comprising of issues for increasing profit based on the perceiving the values about the company.
Literature review
IntroductionEver since the dawn of civilization, it can be seen that there is a man who has indulged as per some kind of construction activity. In most of the countries, it can be seen that each and every activity constitutes and comprises of some of the other gross domestic product as compared to more than half fixed capital formation for the infrastructure and the utilities of public which can be used for the economic development and also for most of the developing countries there are some of the different factors which suggest about the criticism faced due to the construction projects for delaying it with the in turn leads for the disputes which are done as per the abandonment of the project (Bekr, 2015). The literal and actual meaning that can be seen for the term delay can be used to describe about some of the different things that are occurring as per plan and expected and specified for the clients in some of the contracts which can be used for agreeing of the delivery of the project within a certain project that can also enable about the investigation of the projects that are being subjected. There are some of the motivating factors that are needed for causing the effects which are done for representing an area of construction development that are observed as per the number of on-going projects occurring in the city (Karimi, Taylor amp Goodrum, 2017). Construction industry is also known as one of the booming business in the world. It can also be seen that for some of the major industries are concerned and connected with building of roads on a contractual basis (Trauner, Lowe, Nagata amp Manginelli, 2017). There are a lot of industries where it can be seen that it comprises of some of the real estate properties for implementing some of the major issues which can occur about repairing and existing buildings. There are some of the categories of business which are categorised in some of the following categories which can be stated as construction for the heavy buildings and civil engineering involving project for large works such as for construction of different roads and bridges (Sambasivan, Deepak, Salim amp Ponniah, 2017). The another category which can be seen for the construction business is categorised as per general construction where it can also be seen that for building some of the real estate there are building for the commercial residencies.
Theme 1 Contribution of Construction Companies in the economy of the countryThe construction industry is said to be as the second largest industry of the country after agriculture and it can also be seen that there is a significant contribution about the national economy and is also relevant to the provide employment to a large number of people. The construction industry is also said to be as some of the integral parts for the infrastructure of the company (Van, Sang amp Viet, 2015). The construction industry is said to play an important role in the national economy and the economic development of the country. The development of the countries can be used for providing delay to the attention where there is some emphasis for the professional services and also for maintaining the repair and construction (Upstill, Glass, Dainty amp Nicholson, 2016). The construction industry is said to generate substantial employment and provide impetus growth for the linkage of vital activities based for the healthy growth of the economy. There are some of the importance which is seen for the further highlights of economic key factors (Santoso amp Soeng, 2016). The importance which can be seen for the construction industry will be based on the factors where there will be some of the highlights for generating the contributor of GDP which is probably only seen to be about second to agriculture. The total investment based with the infrastructure can be said to be about 65 accounted for the construction industry (Sambasivan amp Soon, 2007). There are also some of the factors which suggest about the total investment made as per the infrastructure for the accountability of the construction activity. The importance about the highlighting of the sector is seen to be about to share it with the total investment based with the construction activity for pegging with the several activities to have an estimation to be about 246 million (Salomon, 2016). The construction industry is said to be one of the main and the most dynamic and responsive sectors in the industry. It can also be seen that for the visibility and the accountability of the economic growth there are some of the things that makes construction sector powerful with having remarkable construction and sustainable development which can satisfy the responding factors based with the shelter of the economic goods (Razak, Roy, Ahmed amp Imtiaz, 2010). There have been some of the past studies which have shown about the positive relationship between the construction output and also with the economic growth. There are some of things as well which are seen as the factors for the developing countries. It is also essential for the understanding of the contribution of the economic growth in the construction sector. One can also examine about some of the roles on the basis of industry figures with socio and economic growth (Rao, Shekar, Jaiswal, Jain amp Saxena, 2016). There are some of the research as well which state about the constructs and the deconstructions based on examining the roles of previous literature. It can also be witnessed that the approach about the construction and its selection can be required for providing the input of the economic growth of the country. The construction industry is also said to have a proper contribution to the economic growth starting from the demand side and which can also be seen as per the economy of traditional and sustainable growth of economic growth and is also totally dependent on the increased demands of the same (Puorrostam amp Ismail, 2011). There are some of the different examples as well which shows and suggests about the third quarter for the developing countries. There are also some of the various investigations that will be based on the contribution of the construction of construction industry. There are some of the investigations which are based as per the indication of the involvement of some of the other initiatives for having a limited view about benchmarking. There are some of the information that are provided by the benchmarking of all of these activities which will result in the analysis of the evolution for it to encourage with the exchange of practices (Ofori, 1988). There are a lot of different countries as well which are seen to have initiatives based for enabling the measures for the needs of successful design for the implementing the measurement and its performance of some of the benchmarking processes along with setting the measures for the companies to get involved.
According to some of the different researches, the major source in the formation of the construction sector is seen to have a developing need about maintaining its sustainability for the human resources and also for enhancing the growths for the construction and sustainable sector. There are some of the different sectors and factors as well that can be seen for maintaining the sustainability for the foreign and the manufacturing sectors. There are some of the factors such as the sustainable foreign exchange for the broadcasting of the earnings made for the prominent changes for the sustainable GDP growth (Lundin et al., 2015). The economy is related with achieving the natural factors bases as per sustainability, growth and development of the sectoral linkages for the economy. The major source that can be seen for the capital formation of the construction sector along with the spur growth in the infrastructure for the overwhelming of the correlation with the construction industry along with the future growth and the sustainable development (Lu, Li, Shen amp Huang, 2009).
According to some of the resources and researchers, it can be said that the strong growth and the economic growth there are some of the average for about 7.4 percent and can be used for the attribution of agricultural and other non-oil sectors. The construction industry is said to developed in the developing countries for viewing it with the sectors of economy which can be done through planning, design, construction and also for the operation that can also be viewed in the generation of the sectors in order to produce the ranges based on the physical facilities in order to make it visible and critical (Laszlo amp Cescau, 2017).
Theme 2 Issues faced by construction companiesThe construction companies are said to face problems everywhere where there are some of the problems and challenges whether it is a developing country or even if it is developed. There are also some of the difficulties where there are some socio-economic stress and also some of the general abilities about dealing it with some of the key issues for providing evidence based to some of the greater extent and severity in the recent years (Horta, Camanho amp Da Costa, 2012). The main issues which are there about addressing the development of the construction industry based on the factors which can influence in the different areas such as globalisation, culture and environment. There are some of the lessons that are drawn mainly from the recent experiences for the other countries based on all of the different levels of development. There also are some of the agendas based on improving the experiences about the construction industries in the resource constraints for administrating the weakness (Gunduz amp AbuHassan, 2016). There are some of the processes where the construction industry is said to deliberately improving the process for increasing the capacity and the effectiveness of the construction industry in order to meet the demands of building the effectiveness in construction industry which can also meet the demands which are based for building on the engineering products and also for sustaining the national and the developmental projects of it to promote with increasing the value for money for it to then provide with the industry clients and also for taking it with the responsibility in the delivery process along with the viability and also competitiveness of the domestic and the construction enterprises (Cannon, Hillebrandt amp Lansley, 2016). There also are a lot of different ways which are seen to have a special feature on the construction industry that can also offer some of the unique opportunities. There are construction industries which should keep in mind about the factors where it can also be seen that for the newer strategies there should be some maintenance about it to lay with the newer factors of the development for it to approach it with the basis of structuring and funding of the suitable strategies in the developing countries (Chen, 1988).
The challenges which are faced by the construction industry lies in the fact where there are some of the direct impact on productivity along with the material loss and also for the completion of the time of the project for it to state about the investigation and the generation having relative generation on the basis of the rapid development causing risks that are related to human health and environment (Banaitene amp Banaitis amp Norkus, 2011). There is also a factor which can usually adopt the systematic and the efficient strategy for minimising the generation of waste at some of the different levels. The advanced techniques can be used for reducing and generating wastes for the purposes of re-using and re-cycling. In other words, the adverse impacts to the environment can said to be as one of the factors where it can be said that there are some of the unfriendly human activities for it to consume with the large amounts for the natural resources in order to produce some of the great deals with the pollutants (Aziz amp Abdel-Hakam, 2016).
The construction industry is said to be regarded as one of the most scheduled driven factors in this type of industry in achieving the projects for the basic requirements and success of the projects. There are some of the studies it can be said that for the minimum and similar research there are some of the factors which can be used in the escalation period of the projects in experiencing delays for it to study about the time delays (Banaitien, Banaitis, amp Norkus, 2011)
The construction industries are said to be characterised with some of the low productivity lacking the standards regarding the poor quality and also for criticising the manufacturing industry for the successful implementation of the philosophy in the quality of spheres in the activities. The quality and the manufacturing industry can be said to be operating with some of the problems in the complex process involving with some of the real barriers of the management for the construction industry to have a fragmented evolvement regarding the specific characteristics for a several project and its environment (Bielenberg, Kerlin, Oppenheim amp Roberts, 2016).
Theme 3 Influence on construction companies due to delay
The delays are said to be frequent and recurring in the construction projects for the developing projects. There are some of the projects and construction delays which are said to be used as per the several factors in pertaining it with the local industry about the socio-economic industry along with the cultural issues that can also contribute to the construction delays (Assaf amp Al-Hejji, 2006). There are several studies which have shown about the construction delays and how common they can prove to be. There are some of the construction delays which results in the costings based as per the overruns and for the poor quality of the disputes that will be a reason for causing the production and the unavailability of the abandonment and the litigation of the commercials in time for it to suffer with the various problems for usually delaying with the completion of the construction projects (Arditi, Nayak amp Damci, 2017). The issues related to the production of the proper material and hence causing the delay of the project can result in the loss of owners revenue for causing the unavailability of the production along with some of the other different factors as well. There are several studies as well that has been found to have with the poor management about the procurement and the delaying of the construction projects. There are some of the studies as well that have shown a various range for the problems for consistently resulting in the construction delays having inadequate procurement systems. There are some of the studies as well which state about the pattern of the problems that can be used for the construction of the identical problems in the development of the shortage skills for the human resources for the design and the construction complexity (Aziz amp Abdel-Hakam, 2016). There are some of the studies which also examines about the problems that are caused for the conducting the factors which can also be observed to have in the developing and already developed countries. There are some of the other factors as well which are said to have benefited from the development of the developing economies. There are some of the companies as well that have been said to be difficult for it to finding it difficult about the timely delivery of the financial resources (Alaghbari et al., 2007).
In the developing countries it can be said that for the comprehensive studies there are some of the common problems that have shown some of the relevant causes for the particular delay of monitoring it with the reasonable research and also for it to monitor with the identification of it to avoid with the dearth of the studies in the perspective of construction. There are some of the various things as well that have been said to have a dearth about managing of the major projects for carrying out some of the various projects in the following of the attempts for the causing of the delays in some of the major construction projects (Agyekum-Mensah amp Knight, 2017). The exploring of the perception for the various construction stakeholders can also result in the creation of the various stakeholders about the major construction projects in causing delays as well. There were some of the different kinds of work for the initial studies as well which shows about the problems being caused for the developing of countries. A strong emphasis can also be seen for the throughout planning which can be said to be attained through proper planning, realistic scheduling and also by continuous monitoring for the avoiding of the construction delays (Adam, Josephson amp Lindahl, 2017). There are some of the important lessons that have been gained by the management and the scheduling of the projects. The construction delay is also said to be evidently a common problem that may be used in the construction projects for the elevation of escalating with some of the construction countries on the basis of involving it with meeting the objectives in a particular time and budget limit for it to play with some of the important techniques for the major factor which can cause the delay on the basis of delay with the loss of income for referring it with some of the higher costs so as to increase the loss of income for it to result with the completion of project as an indicator of efficiency (Al-Hazim, Salem amp Ahmad, 2017). There are some of the sources that primarily involve in the achieving and advancing some of the unpredictable factors and variables which can also result from some of the various sources for affecting it with the indicator of efficiency. There are some of the unpredictable factors and variables that can result with some of the sources for affecting it with the construction projects. There are some of major sources which involve about the performance of parties along with the contractual parties for it to claim with some of the relations for the environmental and the site conditions along with the availability of the resources (Agyekum-Mensah amp Knight, 2017). There are some factors which are seen to have some extra charge for the completion of the project along with the delay in the construction projects and it suggest about the completion time of the project along with it to exceed with the completion time of the project for fluctuating the faults and weaknesses along with the owner and the contractor of the project (Adam, Josephson amp Lindahl, 2017). It is also seen that in order to conduct some of the detailed investigation and identification of the delay factors regarding the selection of the project there will be some of the projects that will result in the selection of the right actions for the counter of the delay factors in order to maintain with the costs and the maintaining of the qualities. There are some of the faults and errors that are seen for the employees for inaccurate projections of the staff. According to some of the studies it can also be seen that there are some of the delays that are caused due to the incapability of the contractor of the project along with the proper use of the capital (Alaghbari et al., 2017). There are some of the most important factors that are seen to have relevance about the contractors in lacking and acquiring of some of the new equipment about the delay factors which are relevant about some of the contractors and its form. The most important factor which can be seen about the contract form is the sustainability of the project along with its time. There are some of the construction projects which analyse about the factors that are associated with the combination of some of the various activities for having a contribution about several parties (Bielenberg et al., 2016). There is also some of the greater parties which can be achieved through the occurrence of delays in the construction projects. There are few results that are used to establish about some of the factors in the groups where there are rankings based on the significant analysis and also for influencing about the groups and rankings of the project in order to gain and achieve some of the different influence of the construction projects. There are various categories as well which can suggest about the evaluation of the well-organised delay factors which can be based as per the professional judgement keeping in mind about the constructions and also for analysing and identifying the consultant related delay factor and groups (Sambasivan amp Soon, 2007). It can also be seen that for each and every project there are some of the projects that can have a significant impact about the construction delays and it can be said that in any of the construction projects there are few things that are required and can be said to be as the three main factors which can occur in any of the construction projects. Time of the project, quality and the cost are those three factors which are quite important for having an importance in the development of the project. These are the type of the factors which are responsible for leading it with leading it with some of the time to overrun in order to influence with the further costs of the project for having consequences such as litigation, negotiation and also sometimes with the termination of the project (Van et al., 2015). These factors also can impact in leading with the consequences like loss of productivity, acceleration of the project, negotiation and also mediation for the project and then ending up with the termination of the project. In other words, these type of delays can also state and can also tell that they are some of the secondary impacts which can occur in the delaying of the project.
Theme 4 Solutions for avoiding issues in construction companies
The requirements which are based in the requirements management can be used for potentially practising and adopting and researching about identifying the several processes and limitations for some of the financial situations. The major requirements and recommendations in the construction industry can be said to have a major productive sector I the construction industry for defining the quality and totality of the features for implementing the characteristics in the project for generating the services that can consider the lack of knowledge at small extents in certain construction industries for persistently creating the problems related with the construction industry (Cannon, Hillebrandt amp Lansley, 2016). It can be seen nowadays that there are some of the factors that can expand the qualities of the customer satisfaction for meanwhile client satisfaction of the creating it as the factor in construction (Chen, 1998). The workmanship can be said to classify in the most frequent and non-conformance form on the basis of the construction site. In order to get rid of the measures that can minimise the workmanship quality and its problems it can be suggested that some of the measures regarding the strict supervision, proper training and education, proper form of designing must be formed for agreeing with the subcontractors to identify and classify the measures of execution in order to possess knowledge and expertise regarding meeting the capabilities for administering the construction work in order to enhance the efficiency of superintending it with various measures (Bekr, 2015). The control of the projects can also cater some of the needs which can then draw the attention of the aspects related to the controlling of the project in the scheduling of the completion of the construction project which can also govern some of the resource constraints. It is also an important factor for the development of the systematic method that the allocation of the resources is done in such a way where there are limited and conflicting demands about the project in the resources that are being generated (Lu, Li, Shen amp Huang, 2009). The other factors which are seen to have a control on the procurement of the resources must closely have some of the project scheduling with the projects. There are certain project owners who face the difficulty and also measure some of the immensely creating of the proper attainment of the data based as per the estimated of the project. The financial control is also one of the factors which can have a permissible limit for it to exceed with the total estimates of the project in order to utilise the funds for authorising it along with ensuring data based as per the maintaining the liabilities based for ensuring and essential liabilities for the exercise of the effective control financial control. The construction industry can also have said to face some of the problems and challenges for providing general inabilities for dealing with some of the key issues (Laszlo amp Cescau, 2017).
Research Methodology
IntroductionThe research methodology can be said to be assisting on the basis of forming and understanding the steps and techniques which can be adopted by the researcher in order to develop the understanding about the steps and approaches for it to apply it with the research for performing it efficiently.
In the chapter of research methodology which falls in the dissertation it can be seen that for the statement of the research problem, research philosophy, types of research approach, designing of the research along with the data collection tools, data types are also used for the sources of the research for the execution of the research work to be used efficiently and extensively. Simultaneously, there is also some of the different ethical considerations as well that will be used for it to face with by the researcher for the concerns related with the accessibility.
Problem StatementThe timely performance of a project can usually be said to play an essence to the employer and the contractor. It can also be seen that the contracting parties can analyse the delays occurring in the project for having some of the purposes in making the right decisions with the potential time over some of the cost compensation claims. In the recent years, the existing delays and its analysis techniques can be said to be important in analysing the techniques having paramount importance in the real problematic issues which are involved in the improvement needs. The main objective which can be seen in identifying the attributes and the delays for the analysis of questioning with the cost compensation cannot be analysed. The reasons which can be seen for the different mode of the application in various techniques are needed to employ for experiencing the different delay and its experiences. The delays are said to be unique and one of the largest issues in the manufacturing and the construction companies which are being faced today. There can be numerous reasons for delays occurring in any of the project. The study in this research will be based on the factors where we can see about the various schedules and delays which are occurring.
Research ParadigmThe research approaches in this case study are numerous and exact to conduct a research work having one definite purpose in order to attain it along with the proper secondary qualitative data. In the perception of the present research work, it can be seen that pragmatic research will be used in order to issue each and every issue of the researcher having its usage this particular assessment. In this particular research, the order of approach for the preferred results of the research can be done for taking into account about the pragmatic method which also takes the mixed approach into consideration. The current research aims to focus on analysing the project delays its causes and how are the global construction companies coping with the same.
In order to conduct this research, it is important to know how the research philosophy is mainly of two types which are named as positivism philosophy and interpretivism philosophy.
The interpretivism philosophy mainly is responsible for taking the emotions of the respondents into consideration for the particular solution. This as a result can also contradict the existence of ones reality also by presenting the ideas which are there for the purpose of manifold with the realities that are being developed through some of social and cultural norms for normally constructing it with the societal perceptions. On the other hand, the positivism philosophy involved in the utilisation of the data for the factual information and the sources. There also is a philosophy where there is an assumption about the societal authenticity which is based for the single entity of the objective and as a result not being impacted by evaluating the same.
In this research, there will be a usage of interpretivism philosophy as the observer will be interacting with the subjects that is being showed in the form of identifying with the casual explanations along with the social entities of being concerned with the continuity of the social phenomenon in the constant state of revision.
Research DesignThe research design is said to be of three types which can also include explanatory research design and explanatory research design and descriptive research design. According to various researchers, there are a lot of research cases where the initial research is done by forming hypothetical and theoretical concept where there are some of the exploratory research design. It can be said that the quantitative and the qualitative research data of the research can be used for implementing the exploratory design research and for holding an idea of observation about some of the relevant subjects and for the enquiries of the research. The implementation of the exploratory research design will involve in the researcher in holding the ideas and observations about the several subjects which can also inquire more knowledge about the same. There also is some of the primary explanation about the execution of the data along with studying all the matter in depth. The researcher with the help of this can also adapt some of the new data for an insight discovery of the matter. On the other hand, there is another type of data that is used for researching the research design of the third type where there are respondents who mix up all of these emotional reactions into consideration while carrying out some of the secondary data into research while performing the other primary data as well.
The current research can focus on the exploratory research design for proceeding it with some of the figures that are based majorly on the exploratory research design.
Research ApproachIn doing any kind of research, it can be said that there are total two types of researches for performing any kind of research. They are known by the names inductive research approach and deductive research approach. They form the basis of the research in any kind of research approaches and it can also be said from these researches that both of them constitute of some different kind of approaches for the gathering of data.
The inductive research is used for introducing the research work for bringing it with bringing up and developing some of the new key concepts and theory in the way. The learnings which can be seen from this kind of research lies in the factor where the researcher can learn from the individual practical experiences. The inductive research is used when the researcher usually begins with gathering the set of observations or sources which can then move towards analysing the same type of data with the information. In simpler words, it can also be said that the collection of the data or any information for any kind of the collecting the data along with carrying out of newer theories. There are in total three type of research which are used and are involved in conducting the proper implementation of the inductive research and it includes in collecting the data, ideas, theories and concepts for the utilisation in order to successfully extract and gather data from some of the previous research and its sources where there are some of the newer concepts that should be possessed from the higher exclusivity. There are some of the similar and previous theories and concepts which are repeated but not in this case as there is no repetition of the previous concepts and theories.
The deductive research on the other hand is the exact opposite of inductive research. The deductive research is basically known as forming of a framework which can suggest the researchers about the facilitation of the usage of models, concepts and theories which as a result can get some relevant experience for the research work. There also is an outlining of some of the steps for it to involve with the outcomes of the research. The outlining of these researchers can be used for mentioning about the usage and its importance in order to realise the theories of the relevant work.
In this present research, there is a usage of the deductive research approach that can also be used as a most suitable approach for it to identify and analyse with the findings of the reasons, factors and also for identifying the reasons along with the identifying with the reasons, factors and issues which can be used for the identification of the term where an analysation of the issues related to the construction companies are being dealt with. This as a result, can also provide a particular way where the researchers can identify the reasons and factors be used. This as a result is also enables and provides the researcher for illustrating about the particular conclusion for collecting the secondary data for its approach to recognise the precise and reliable results.
Sample size and sampling techniqueThe sampling technique which is used in the research encompasses mainly with the two types of sampling which are also called as probability sampling and non-probability sampling. There are few cases where it is difficult and almost impossible for a researcher to determine the exact respondents in proper figures or numbers which are required in figures or numbers that are required for a survey in order to successfully implement the completion of the research. It can also be said that the total number of respondents are not fixed from the inception.
In probability sampling technique there are some of the techniques which are also known as random or chance sampling technique. In this category, it can also be seen that each and every unit in this category is possessed by the equal inclusion probability in the sample. It is a method which is also known for some of the individuals to randomly select from a particular sampling segment or group with the help of the automatic processes.
On the other hand, it can also be said that non-probability sampling and its method does not involve for us to include each item of the population in the sample. It is also known as judgment sampling, deliberate sampling and also purposive sampling.
In this research study, there will be no use of sampling or either non-probability sampling.
Data collection methodThere are essentially two major types of data that are required for the effective conclusion of the research work. According to some of the researchers, it can be seen that the primary data is a type of a new and fresh data which is used for gathering of the information based as per the collecting some of the several responses from participants who are also involved in responding to some of the open ended questions who also focus primarily on the groups along with face-to-face interviews and surveys having some of the postal surveys, online surveys, telephonic interviews and many other forms of data for collecting and gathering the data for information. In other terms, it can be said that primary data collection involves majorly in collecting raw data for conducting a particular research with a new concept and experience. The primary data is based mainly on the general specific to the needs and requirements of the research and researcher.
On the other hand, it can be said that secondary data is the type of data which is used for the collection of data in some kind of research work for involving it to use it from the existing researches and theories for the data collection of the research work and also for involving it with the help of some of the already existing researches and theories that are based majorly from the previous researches. It is also based on analysing and interpreting the information which is based primarily by some of the other researchers. There are some of the researchers which helps in gathering the data that is based primarily and mainly for from it to gather from some of the various forms which may be of the form journals, books, articles, newspapers and through some of the other important resources. The data which is collected from the secondary resource may or may not be specific to the needs and requirements of the research work. There is a key difference which is formed as per some of the primary research and secondary research which is attained by identifying and studying if it is gathered from the past or not.
The present research work will focus on the secondary data which will focus majorly on the quantitative research. The theories, models and the concepts will be based on the research subjects for discussing it with the help of the secondary data that is being gathered. The secondary data which is being gathered will help in collecting the data from reliable and consistent sources. This will also include in gathering and analysing the data coming from the latest books, journals, articles etc. There are some of the primary data which is based by analysing and conducting a survey based for identifying and analysing the project delay causes and how the global construction companies are coping with the same.
Data analysis technique The analysis of qualitative data will be done with the help of the narrative outline. The theories, model and it causes based as per contributing it with the analysis and causes for dealing about the construction companies who are dealing with the same is determined with the help of the secondary qualitative data. Subsequently based on the basis of the literature review and factors which are contributing to the delay causes in the projects and how the global construction companies are coping with it. There are several means that are available for analysing the data for the researchers such as thematic analysis, graphical representation, excel and other tools. The SPSS tool can also be used for some of the different researches, but in this case the data will not be gathered from SPSS software tool but it will be gathered from the secondary qualitative data and it will also help in the researcher to analyse about some of the demand and expectations about the employees who are working in the projects and how they are dealing with the delay causes.
Ethical considerationsThe ethical considerations play an important and a crucial role in the research work. They are used and referred with the principles and standards having some of the norms that are required in taking into account some of the limitations for conducting a particular research. It is also considered as an essential approach for conducting research in order to avoid the data fabrication for the production of promoting it as some of the prime objectives in the research creating objective and also as the information with the knowledge, facts, understanding and truth. In this case study, the researcher has maintained a proper decorum for the conducting the research as the data that has been collected has given proper acknowledgement to the data that has been gathered from the secondary literature. The material and the research that has been gathered has served a present research work and are accessing the data only from the reliable sources. The data that is submitted does not include of any form of discrepancy and the aims and objectives from the previous research paper has taken into consideration in a proper form. In addition to that, the research has also conveyed in the proper knowledge and message of the data which in the same way of researching it with the sources.
Research Methodology Limitations The researcher will be focusing on the topic where there will be a proper analysation of the project delay causes and how the other constriction companies are taking it and how are they dealing with it. There are considerable issues that are seen for the accessibility about the researchers in terms of the issues that are related with the reluctance. There are some of the other problems as well. The other problems that can be seen to experience with the researcher having some of the different company approvals for the survey can be based on somewhat complicated factors causing the delay in any sort of the project.
Data analysisIn order to analyse and conclude the data along with the results and findings of the present research, the research will be based primarily for identifying the present research. The data will be formed with the basis of selecting themes that will help in conducting and gathering data from the analysis of the same. As per the data observed and conducted from the secondary qualitative data we can know about the data and analyse about some of the causes which enables the delay for how global construction companies are coping with it.
Theme 1 Contribution of construction companies in the economy of the countryIn response to the themes that are formed as the basis of construction companies it can be seen that the construction companies comprise of a substantial contribution in the national economy and how it is relevant to providing employment to a larger number of people. The construction industry is said to provide employment to a larger number of people and as a result it can be said that this as a result contributes in the economy of the country. It can also be seen that for the development and the involvement of the infrastructure there are a larger number of people who will be serving as the proper infrastructure of the company. It is also seen that there are some of the construction industries which play an integral and important role in providing the services to the economic development of the country. There is a development about some of the economic development of the country as they are used for providing the delay to the attention having some of the professional services that can maintain the repair and construction based on the sustained employment for it to generate with the impetus growth in linking the activities which can be based with the importance of economic key factors of the construction industry. Construction is said to be an important sector in contributing it greatly with the economy of the nation. There are some of the construction companies which lead in the investment-led sector for the government in showing them as high interest. The contracts that are generated from the government is based and linked with the construction industry in order to develop infrastructure which can also be related to health, transport and also with the education sector. Since the construction industry is said to be diversified in a lot of different ways and due to this it is also responsible for the property builders and other material suppliers and contractors for building various cost-effective solutions where the clients can play an active role in making the contract into a successful deal. There are some of the attractive construction for the infrastructure of the investors business for creation of a healthy work environment. The construction industry comprises of generating activity and employment in other sectors of the economy in manufacturing of other interlinkage sectors. Studies have been conducted and it states about the gross domestic product of the national employment in the formation of construction with half gross of fixed capital formation. It is quite evident that the contractors can help in the socio-economic development of the industry in playing a different kind of process. The major and main importance for the contractor in citing the adequate and sufficient role can make the industries as per the efficiency of development based on some of the construction and domestic industries. It can also be seen that the construction industry also plays and provides a necessary physical infrastructure in the rural communities.
Theme 2 Issues in construction companiesIt is said that the companies are also said to face a lot of problems and challenges in the recent years. There are some of the developing countries where there are some of socio-economic stress and which can also become as a significant extent based with the industrialised countries. It can also be said that the construction companies agree in the deliberate process for improving the efficiency of the construction industry for the building of sustained national and economic development and its objectives. The objectives, lessons that have been gathered from the experiences of the construction industry is said to have globalisation, culture based as per the requirement of the development. The agendas which are based as per experiencing about some of the construction industries in deliberating it with the construction industry. The construction industry also has various special problems and requirements which are seen to be formed as a discussion key features of the industry. There are some of the importance which are based as per taking some of the important measures in the performance of the construction industry to be recognised in various different countries for administering it to the counterpart of the institution having some co-ordinate efforts for involving it with the greater sustainability of administering it with the counterpart of the institutions of the government agencies. In some of the construction industries there are some of the issues that are said to become important in the efficient strategy of the minimisation of waste generation. There is no doubt that the construction industries can also involve in the financial and the general foreign investments for creating work based as per the lower costs of the projects to the developing countries. The economies which are seen to currently confront some of the severe difficulties are able to characterise it with low productivity which can also lack in the standards of poor quality in the criticising of some of the successful implementation to be based on the solving relevant and complex problems in the involvement of project in easing the social problems of the project in this environment and development. The construction industry makes use in the long-term view of the companies for the prepare for the industrial fragmentation among the low integration of the value chain.
To summarise, there are some of the adverse policies that are a lot of problems in the construction companies and for the same there are major issues which are faced as they are generated due to the insufficient capitals, insufficient profits and even there are some of the lack of business and managerial knowledge which is based as per the experience with some of the lack of line experience. The high employee turnover rate can also be said to generate with the poor accounting systems and over-expansion.
Theme 3 Influence on construction companies due to delayThere are some of the contracts as well which are based on the price and rapport of developing it with bidding and also satisfying with an agreement of bringing competition to the awarded arrangements as well which can also satisfy and arrange some of the quality of expectations. There are several risks which are inherited with the ground having an overrun in the construction projects. There also is a lack of guidance which is provided for the procurement of the adequate site in its recognition. The avoiding of the projects in the construction industry is said to be as one of the most important aspects of the project management in the construction industry. It can also be said that the construction delays can result in reducing the delay with the annual revenue figures for the demonstration of the clients in order to disorganise it with some of the other clients. There are several penalties that are formed with aspect to delaying it with the construction project and this as a result can also mitigate some of the factors in planning the crucial analytics for determining it with some of the other right decisions in order to keep the project on track. There are several terms that are used for intensifying about the sustainability and development for undertaking some of the specific aims which can also engage for satisfying the stakeholders in increasing the likelihood of the survival for it to include with the process which can also increase some of the critical resources for the survival of the projects in increasing the danger of focus for the impossibility of embracing it with the conflicts and for the survival and the progress. There are some of the studies which tell about the issues that are carried out for following the collaborative approach for the realistic scheduling in the continuous mentoring for it to avoid with some of the construction delays. There are some of the major lessons that have been learned from the studies which also occur by approaching the willingness of diagnosis for the problems which can be stated to be of the form having some contextual differences. The main issues that can be seen for the construction projects are based on the fact where the main identified issues were of the form having lack of resources, poor management of the contactors.
Theme 4 Solutions for avoiding issues in construction industryThere are various requirements that are seen for potentially practising and adopting with the researches in identifying the processes which are attached for identifying for the several processes for the limitations and requirements which can also implement about some of the construction industries as a totality feature which can also generate the services in providing persistent problems where there is a relation of the construction industry. It is nowadays seen that for creating the factors in customer satisfaction there will be a creation of several factors in construction industry. In order to control the projects based as per the development of systematic allocation of scheduling with the project owners in the procurement of resources for investing in the effective control of the financial aspects. There are some of the process of research as well where there is an achievement of the sustainable development which can also minimise some of the impacts with the appropriate management in considering it with the detailed design for the appropriate management in order to reconcile it with the need of the economic growth with the ecological management and maintenance which can also be used in the form of sustainable development in the construction industry. There are some of the presented matters as well which suggest about the fact where there are some of the complimentary problems based with some of the real circumstances. There are a lot of delays which are seen to be frequent and recurring in the construction projects. There are some of the principal reasons as well that are seen to pertain in the construction industry for some of the socio-economic and cultural issues along with the cultural issues in the characterisation of the project for exploring it with lack of resources that is also related with the delay of the project. It can also be stated that the other factors which are related with the issues caused by the designers, contractors and also consultants are said to have some of the financial difficulties where those problems can be said to have a multicultural and multilingual environment which can cause some ineffective communication for a larger number of participants of the project for the involvement of the various foreign designers and contractors who can also discover a lot of different factors about the delays caused in construction projects. The other identified problems were of the form where there was a shortage of labour, design delays for the planning and the scheduling deficiencies. The other changed orders are of the form where the contractors had to also find out about the financial difficulties. The lack of standardization in the design where the contractors and their differences for the controlling of the project having some inadequate experience of the staff was also seen. It can also be said that the financial factors are some of the factors where the essential liabilities for the people who face problems based on the effective control of the financial and the key challenges are said to be provided with the inabilities of the key issues.
FindingsIt is a well-known fact that for the proper and the critical factors of a project success there is a stipulated time frame that can also be considered for the majority of the construction projects having some of the scheduled delays and issues becoming a major problem in managing a particular kind of project. The project delays in simple words can be said to have a proper overrun of the scheduled project as per the completion time. There are four different issues that where researched about in this particular research and which state that the economy of any country plays a crucial role in the substantial contribution in the growth of any country. The sectors comprising of the construction industry are based on the factor where it can be seen that for the current prices for the GDP consumption there are some factors where the contribution of agriculture with the basis of having some higher industry services are said to be of the form where there is a decline of the service sectors with an increase to a certain percentage. The construction industry is also said to contribute significantly in the terms of scale and share with the development process of the both developed and the developed countries. The construction industry is responsible for the public infrastructure and for the physical structures of various different productive activities such as service, commerce, utilities and also for some of the other industries. The industry is also said to be as an important and finished product for it to employ it with the large number of people having an effect on the economy of the finished products with the people having an employ of a large number of people which can actually result in the country/region for the actual construction project. There are some of the work which are done for carrying out investigations based for the construction flows on the basis of several other surveys in using some of the statistical forms with the input-output modelling. The system and its modelling is said to examine with the intensive and the equipment based construction projects. As a result, it was found that the construction project can provide a very important contribution to the national and the local economy for generating the ability for some of the local people as multiplier effects in predicting the effects and changes in the policy of expenditure for some of the micro scale. The construction is said to have a major component for the output of the investment in the part of the fixed capital. There are some of the essential factors as well that are seen for the continuous economic growth. There are some of the products in the construction industry that require the formation and also expect the supply services for a period of time. The state of the construction industry affects the most common measures for the national economy as it can be seen that the availability of the capital will be affected due to this and along with that there are some of the decisions as well which can also make the social health of the country. The construction industry is also said to have a significant interaction with the economy sector as it can also have some of the multiplier effects in the backward and the forward linkages of the country. The construction industry is also said to have a vast and it can also vary many other different aspects for the construction sector and it also can state about the fact where there are some of the related industries which are attached to some of the other construction industries as there are a lot of different factors that are involved as the main success keys for the construction management and its related project. The construction industry is often said to be a complex and major industry having some of the vast influence in the outcomes of a construction project. There are some of the construction industry which are said to manage the projects based on the complexity of those issues. The major and the main success key factor which are seen in this kind of project are said to be of the form where there is a proper contract management. The proper contract management is also said to be defined with meeting the obligations which can involve in building a proper working relationship between the customer and the provider. The contract management is also said to be involved in one of the most productive sectors for its association with the settlement process of the stability in its relation with the construction industry. There are some of the research methods that are seen for the survey of the aim in the sector where there are some of the local contract stakeholders. There are a lot of aspects that are seen to give in the close attention for the building of the construction project in the field where the contractors are also there for ensuring a proper set of documents in whatever form they are available. The limited skilled capabilities are founded to be as one of the biggest problems in the construction industry having an inadequacy of the skilled workers which can also meet with the growing demand in the market. There are some of the other factors as well which are said to contribute with the knowledge having benefits of career in construction and which can also have a culture of working with some of the other teams for establishing it with the agencies with a workforce which can fit into the job. There are some of the acceptable reasons for the delays in the projects which can need to be aware for the factors in addressing of the quick communication to be made with the homeowner and the contractor immediately. The lack of proper organisation with the project management is said to mandate the reasons and can also be used in the procurement process for coping up with the speed and scale of demand.
DiscussionsThe claims in the delay are said to be as the major source of conflict in the construction industry and it is also believed that it is one of the difficult issues to resolve. There are some of the knowledge of application which is based as per the proper analysis in the resolution for the claims of understanding the resource for affecting the delay in the analysis process such as the project calendars for the rescheduling activities with some of the lags and status updates. The basic assumption for maintaining the tradition for the resource allocation in utilising the process of construction. The enhancing of the amicable settlements in the claims for the purpose of agreeing it with the legal aspects based as per the concurrent delays for handling situation in a different situation. The availability for the resources in the analysis of the sophisticated techniques for using the sources as per inadequate terms. In this research study, it can also be seen that the delays in any kind of the project are a universal phenomenon and they are almost accompanied by the cost and the time of the overruns. There are some of the researches where there is an establishment for the root delay in the delay analysis for the methodologies and for the impact of delays in the construction projects in various developing countries. There are some of the projects where we can see that the activities of the project are basically the same as that of the construction projects. There are various techniques as well which are seen to have the calculations based on calculating the delays. The mining and the projects related to that are based on the fact where we can identify the causes of delay in the construction industry. The analysis of the delay can be classified with the separate categories which are also called as the foresight method, the hindsight method and the contemporaneous method. The delays which can be caused with the direct relation of the other factors can be used with the failure of the guarantee and the warranty for the status of the project. It can be seen that there are several parties which are involved in creating higher costs along with the significant manpower and large payrolls for the people working in the complex schedules having a perspective owner which can also serve in one of the important purposes. In this case study, there are various factors that can also serve purpose along with the schedules included for the planning and the sequencing of the work. In order to get over and serve the purposes like that of the delay one should make a constant monitoring and updating for claiming the delay as per the project schedule having some significant liability. The delays can result in completing the construction project in creating a significant financial impact on the owner and the contractor both. Most of the times there are some of the parties as well where the person is also able to resolve some of the disputes that may arise due to the delays and which may also fall to the court having some arbitrators in determining the parties for the delays of the parties in the increased costs of several factors where there is a limitation in the allocation of the risks and which are classified in the construction delays having some typical fall for the inexcusable delay in the third parties where the contractors are also responsible under the contract with depending up on the type of delay for entitling the owner in the relief. The thematic analysis has been performed in the construction industry for the real estate properties where there is an implementation with some of the major issues and we can also discuss about the factors where there is a contribution of the construction companies in the economy of the country. It can be seen from the above mentioned reports that the construction industry highlights and generates about 65 percent of the investment for the accounting of the construction industry. The factors which also suggest about the most dynamic and the responsive sectors in the industry having a remarkable construction and sustainable development for satisfying the accountability for some of the inexcusable delay. There are some of the examples for the people where the provision of reasonable estimation in the actual damages will be a reasonable cause limiting for the cause of delays caused by some of the reasons having some sustainable and remarkable growth. The visibility and the accountability of the economic growth and its care is said to have a positive relationship with the construction output. The other thematic analysis was done for the influence of the construction companies due to delay and it can be said that there are various factors that can be seen for the generation of influence on construction companies due to delay are caused with contributing it with some of the construction delays along with some of the issues related to the production of proper material and also for causing the delay of the project for the loss of owner and their revenue in the unavailability of the production having different factors based with the poor management with the procurement and the delay of the construction projects. The studies which show about the development of the inadequate procurement for generating the issues
ConclusionThe management of the project is not what it actually seems to be like, there are a lot of factors that are required for a person to making it as a skill of time, patience, perseverance. The proper management of the project requires in the constant analyzation of the setback failures which can also implement about the lessons that should be learned from the same. The improvements that are formed by the employment and the production can state about some of the different counteracting effects of the manpower scarcity along with the expenditure on education for the increased and the government sealed agreements. There are several reasons that the construction companies are particularly concerned about and it can also prevent and provide some of the alternative solutions for the absence of certification in building up some of the consistent track record for also providing it with time and opportunity having some of the high profile clients. There is an expansion about the government expenditure based on the social infrastructure of the transportation infrastructure for it to create with the construction industry with potential multiplier effects. The construction companies are also involved with the public sector in the regulation of the public having a traditional bid based on the pre-requisites in registering it legally. In this research study, there were some of the key objectives that were needed to be achieved with the help of the particular kind of work for it to define with the specifications of the construction companies and it suggests about the fact that one needs to obtain about the overview of the construction companies. The other factors that are covered in this research study was to understand about the delays and the main causes that are being caused for the same. The other objectives of the research lie in the factors where one can analyse about the factors and issues which basically cause the delays in the project. The developing of the solutions which are there and how can one being a person involved in the construction industry help in developing the same. It is a well-known fact that there are a lot of companies who focus mainly on the productive and the construction industry to invest in them with some of the resources which are also involved in attaining the new employees. There are some of the different and the ultimate effects as well for the construction companies in employing the companies to become a supplier in the management of the reduced flow of investments as well. There are some of the targeted interventions as well that are seen to have a supported sustained growth for the additional reductions as well. There are a lot of environmental concerns as well which are seen by some of the construction industry for having a worldwide and experienced modernization for the performance of the factors which can also result in the reduced degree of absorption in the new technology which are associated with the lack of skills. The contribution of the economy in the contribution of the construction companies was seen and along with that there was a discussion of the major issues being faced by the construction companies with the protection of the intellectual skills and property rights is been discussed. The determination of the major issues and how can delay result in facing with the construction companies is being discussed. The solutions which can avoid the issues in the construction companies for playing it with improving GDP in the environment based construction industry was done. The construction industry is also seen to be followed on the basis of the category where there are projects which are involved in forming some special categories in the construction business. It is seen that there are a lot of different factors which cause in the contribution of the GDP for the agricultural practices. The investments which are based as per the accountability of the construction activity along with the industry. The investments for the dynamic and responsive sectors in the industry are said to be of the form where there is a sustainable development in the accountability of the economic growth. The studies can also show about the roles and the factors for the social and the economic growth based as per the constructs of the research. It is also discussed in the case study that the sustainable foreign exchange can also result in the broadcasting of the earnings which are made as per the GDP growth for the economic related growth. There are a lot of other factors as well which are seen to have a major source of formation with the construction sector for the sustainable development of the resources and researchers. The issues which are faced by the construction companies also result in the fact where there is a globalisation regarding the culture and the environment along with the different levels of development. In order to relate with the construction industry there will be some of the deliberate processes as well which will have an effectiveness based on the sustainability of developing the projects. The construction companies which are also related with creating a direct impact on the investigation and the generation of the human health is seen to have an adverse impact about the environment. The construction companies as characterised of the form having low productivity and which can also lack the standards as per the quality and the manufacturing of the fragmentation of the real barriers in the process of construction industry. The studies also suggest about the fact where there is a conduction of the factor for the already developed countries and which can also benefit from some other factors for the timely delivery of the financial resources. A proper amount of emphasis for giving the planning as per the realistic scheduling for the continuous monitoring of the construction projects and its delay should be studied to be seen it as an elevation of escalating it with the involvement of the specific objectives. There are a lot of projects on which the timely delivery is considered to be of utmost importance in order to take and analyse the processes based on having and forming purposes for the right decisions of the analysis techniques with identifying the attributes and the delays regarding the cost compensation in delaying the experiences related to that. There are several requirements which are based with the changing of the management with considering and lacking small extents of construction industries that can also persistently create and solve the problems that are related in the construction industry. It is of utmost importance to see that the construction activity along with the total investment for pegging it with the topmost priority in the sectors that can also describe the sustainable development in the dynamic and responsive sectors.
Recommendations
It is seen from this above research that there are some of the major and main differences between the project manager and an individual contributor is how they manage time and all the other necessary factors. The people who lead the construction related projects are said to have deal with a lot of frequent interruptions. There are some of the project related problems that may also be said to be a consequence of the project related issues which are used for the management of the project. There are as a result two main tasks on which the project managers should primarily give focus on and it lies in mainly focusing about some of the responsibilities and the personality traits for the effective project manager in setting up a formation and foundation to the project manager and project management. The project managers should be responsible for instantly covering the confidence of their teams with relevance to the explicit backing and supporting the assets that are needed to build focus on the subject matter and their expertise. There are some of the training that is built from the unscheduled project management in their process having a context for the building of the valuable skills. The most effective way to ensure a fast start results in the development of the appropriate templates in the project plans which can also involve in the development of the project for retaining the similar future projects. The processes that can streamline should be eliminated by establishing the main and basic requirements for the setting up of the projects. The projects represent a lot of change having a potentially overwhelming number of the failure modes. There are various parts where there are compressed timings related with the set duration for triggering some of the other technicality and the thorough planning in their help. The understanding of some of the basic benefits in the deliverables of the document in the credible cases can be used as a successful implementation of the project and also for ensuring some adequate staffing and funding of the work. There are plenty of challenges that are faced by the construction companies at every aspect of their time. The problems may also include of the point where keeping the teams on the same page, poorly defining of the goals and objectives and risk management may be difficult. However, they can be solved with the right mix of controlling, planning and also monitoring in making the difference. There are a lot of different aspects that needs to be covered for the managing of the projects. In order to ensure that all of the teams are working with the same pace and are on the same pace one should ensure that all of the teams and the clients should be provided with one definite specific task along with following of the schedule. There are many of the projects which includes a schedule and a team working for the project, one should ensure that for including the schedule one should know that what are the things that are coming up from the project. The other things that can be done for providing a clear objective to the project one should ensure that there are some of the goals set for developing a proposal which can also define the objectives that can also define the objectives for the proper project planning. The project managers should also take care of the deadlines and some of the other related issues with the impeccable planning and for providing the alternative analysis of the real-time progress to the project participants. The allocation for the managing of the resources for the efficient and the delivering of the projects within budget can be used for it to naturally become a challenge in sneaking different functionality of the project.
There is no doubt that a lot of projects which comprise of one particular challenge and it requires in the certain level of knowledge from the people. However, this can be analysed through the fact where one can document the core set of skills for accomplishing the workload analysing the strengths and weakness of the team members. It can also be required that one should train and enhance their knowledge for ending some of the skill gaps. The communication skills are also an important aspect which is used as the biggest project management challenges in the successful delivering of the projects. Hence, it is advisable that the project managers should emphasize a little more than usual for effective communication. There also are some of the successful communication used in the translation of the successful projects in the projects for failing due to breakdown in communications. There should also be a proper determination about the communication flow for the project managers that can also develop some of the way in order to inform about the needs of information to the members of the project. The management of the risks is also said to be as one of the most important aspect in the coordination of the application of the identification, assessment and prioritization of the risks for following it as an application to minimise the resources, monitor and also for the controlling of the events. There are a lot of times where the projects dont go as planned in the management of the risks and it can also be said that for dealing with the risks and the management of having uncertainty in the projects. It can also be considered impossible to predict each and every potential risk for the strategic planning and the collection of the information based with overseeing the risks in the uncertainty of the hidden flaws. There are a lot of ways where there can be an elimination about the issues and negativity for the team on the basis of creating a positive work environment. The accountability is one different factor which also starts with the start of the project for building a particular workflow.
References
Adam, A., Josephson, P. E. B., amp Lindahl, G. (2017). Aggregation of factors causing cost overruns and time delays in large public construction projects trends and implications.Engineering, construction and architectural management,24(3), 393-406.
Agyekum-Mensah, G., amp Knight, A. D. (2017). The professionals perspective on the causes of project delay in the construction industry.Engineering, Construction and Architectural Management,24(5), 828-841.
Al-Hazim, N., Salem, Z. A., amp Ahmad, H. (2017). Delay and cost overrun in infrastructure projects in Jordan.Procedia Engineering,182, 18-24.
Alaghbari, W. E., Razali A. Kadir, M., Salim, A., amp Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia.Engineering, Construction and Architectural Management,14(2), 192-206.
Arditi, D., Nayak, S., amp Damci, A. (2017). Effect of organizational culture on delay in construction.International Journal of Project Management,35(2), 136-147.
Assaf, S. A., amp Al-Hejji, S. (2006). Causes of delay in large construction projects.International journal of project management,24(4), 349-357.
Aziz, R. F., amp Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt.Alexandria Engineering Journal,55(2), 1515-1539.
Banaitiene, N., amp Banaitis, A. (2012). Risk management in construction projects.Risk ManagementCurrent Issues and Challenges. In N. Banaitiene (Ed.), Risk ManagementCurrent Issues and Challenges, 429-448.
Banaitien, N., Banaitis, A., amp Norkus, A. (2011). Risk management in projects peculiarities of Lithuanian construction companies.International Journal of Strategic Property Management,15(1), 60-73.
Bekr, G. A. (2015). Causes of delay in public construction projects in Iraq.Jordan Journal of Civil Engineering,159(3091), 1-14.
Bielenberg, A., Kerlin, M., Oppenheim, J., amp Roberts, M. (2016). Financing change How to mobilize private-sector financing for sustainable infrastructure.McKinsey Center for Business and Environment.
Cannon, J., Hillebrandt, P. M., amp Lansley, P. (2016).The Construction Company in and out of Recession. Springer.
Chen, J. J. (1998). The characteristics and current status of Chinas construction industry.Construction Management amp Economics,16(6), 711-719.
Glass, J. (2012). The state of sustainability reporting in the construction sector.Smart and sustainable built environment,1(1), 87-104.
Gunduz, M., amp AbuHassan, M. H. (2016). Causes of construction delays in Qatar construction projects.International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering,10(4), 516-521.
Horta, I. M., Camanho, A. S., amp Da Costa, J. M. (2012). Performance assessment of construction companies A study of factors promoting financial soundness and innovation in the industry.International Journal of Production Economics,137(1), 84-93.
Larsen, J. K., Shen, G. Q., Lindhard, S. M., amp Brunoe, T. D. (2015). Factors affecting schedule delay, cost overrun, and quality level in public construction projects.Journal of Management in Engineering,32(1), 04015032.
Laszlo, C., amp Cescau, P. (2017).Sustainable value How the worlds leading companies are doing well by doing good. Routledge.
Lu, W., Li, H., Shen, L., amp Huang, T. (2009). Strengths, weaknesses, opportunities, and threats analysis of Chinese construction companies in the global market.Journal of Management in Engineering,25(4), 166-176.
Lundin, R. A., Tryggestad, K., Amoatey, C. T., Ameyaw, Y. A., Adaku, E., amp Famiyeh, S. (2015). Analysing delay causes and effects in Ghanaian state housing construction projects.International Journal of Managing Projects in Business.
Ofori, G. (1988). Construction industry and economic growth in Singapore.Construction Management and Economics,6(1), 57-70.
Pourrostam, T., amp Ismail, A. (2011). Significant factors causing and effects of delay in Iranian construction projects.Australian Journal of Basic and Applied Sciences,5(7), 450-456.
Rao, B. P., Shekar, S. C., Jaiswal, N., Jain, A., amp Saxena, A. D. (2016). Delay analysis of construction projects.Journal of Information Technology and Economic Development,7(1), 15-24.
Razak Bin Ibrahim, A., Roy, M. H., Ahmed, Z., amp Imtiaz, G. (2010). An investigation of the status of the Malaysian construction industry.Benchmarking An International Journal,17(2), 294-308.
Salomon, R. (2016).Global vision How companies can overcome the pitfalls of globalization. Springer.
Sambasivan, M., amp Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry.International Journal of project management,25(5), 517-526.
Santoso, D. S., amp Soeng, S. (2016). Analyzing delays of road construction projects in Cambodia Causes and effects.Journal of Management in Engineering,32(6), 05016020.
Upstill-Goddard, J., Glass, J., Dainty, A., amp Nicholson, I. (2016). Implementing sustainability in small and medium-sized construction firms The role of absorptive capacity.Engineering, Construction and Architectural Management,23(4), 407-427.
Van, L. T., Sang, N. M., amp Viet, N. T. (2015). A conceptual model of delay factors affecting government construction projects.ARPN Journal of Science and Technology,5(2), 92-100.
Sambasivan, M., Deepak, T. J., Salim, A. N., amp Ponniah, V. (2017). Analysis of delays in Tanzanian construction industry Transaction cost economics (TCE) and structural equation modeling (SEM) approach.Engineering, Construction and Architectural Management,24(2), 308-325.
Trauner, T. J., Lowe, S., Nagata, M. F., amp Manginelli, W. A. (2017).Construction delays. Elsevier Science amp Technology Books.
Senouci, A., Ismail, A., amp Eldin, N. (2016). Time delay and cost overrun in Qatari public construction projects.Procedia engineering,164, 368-375.
Karimi, H., Taylor, T. R., amp Goodrum, P. M. (2017). Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance.Construction management and economics,35(6), 368-380.
Bekr, G. A. (2015). Causes of delay in public construction projects in Iraq.Jordan Journal of Civil Engineering,159(3091), 1-14.
Iqbal, S., Choudhry, R. M., Holschemacher, K., Ali, A., amp Tamoaitien, J. (2015). Risk management in construction projects.Technological and Economic Development of Economy,21(1), 65-78.
Seymour, H. (2019).The multinational construction industry. Routledge.
Santorella, G. (2017).Lean culture for the construction industry Building responsible and committed project teams. Productivity Press.
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S. O., Akinade, O. O., ... amp Pasha, M. (2016). Big Data in the construction industry A review of present status, opportunities, and future trends.Advanced engineering informatics,30(3), 500-521.
Hughes, W., Champion, R., amp Murdoch, J. (2015).Construction contracts law and management. Routledge.
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., Owolabi, H. A., amp Kadiri, K. O. (2015). Waste effectiveness of the construction industry Understanding the impediments and requisites for improvements.Resources, Conservation and Recycling,102, 101-112.
Buvik, M. P., amp Rolfsen, M. (2015). Prior ties and trust development in project teamsA case study from the construction industry.International Journal of Project Management,33(7), 1484-1494.
Trauner, T. J., Lowe, S., Nagata, M. F., amp Manginelli, W. A. (2017).Construction delays. Elsevier Science amp Technology Books.
Larsen, J. K., Shen, G. Q., Lindhard, S. M., amp Brunoe, T. D. (2015). Factors affecting schedule delay, cost overrun, and quality level in public construction projects.Journal of Management in Engineering,32(1), 04015032.
Burr, A. (2016).Delay and disruption in construction contracts. Informa Law from Routledge.
Keane, P. J., amp Caletka, A. F. (2015).Delay analysis in construction contracts. John Wiley amp Sons.
Santoso, D. S., amp Soeng, S. (2016). Analyzing delays of road construction projects in Cambodia Causes and effects.Journal of Management in Engineering,32(6), 05016020.
Bagaya, O., amp Song, J. (2016). Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso.Journal of Management in Engineering,32(5), 05016014.
McCord, J., McCord, M., Davis, P. T., Haran, M., amp Rodgers, W. J. (2015). Understanding delays in housing construction evidence from Northern Ireland.Journal of Financial Management of Property and Construction,20(3), 286-319.
Bekr, G. A. (2015). Causes of delay in public construction projects in Iraq.Jordan Journal of Civil Engineering,159(3091), 1-14.
Jusoh, Z. M., amp Kasim, N. (2017). Influential factors affecting materials management in construction projects.Management and Production Engineering Review,8(4), 82-90.