Civil Engineering Project Management

Table of Contents

Project Documents.

1.1 WBS.

1.2 WBS dictionary.

1.3 Activity List

Bibliography.

1. Project Documents

The project document is generally based on the project schedule where the activities of the project have been mentioned. This document is included with the cost of every activities and the duration of these activities which have been highlighted in this project. In addition, this document will mention the activity description and time schedule within that the activities need to be completed. Moreover, the project document will include that estimated cost which has been calculated for every activity. In addition, the project document will calculate the estimated cost based on the activities and it will measure the extra cost if that will be needed for the project.

1.1 WBS

The WBS is needed for the project scope and the objective of the project. The structure will provide the schedule and it will measure the time schedule of the project. It will calculate around which time the project will be completed. In addition, this structure will help to identify the task activities and the task which will take place one by one.

1.2 WBS Dictionary

WBS stands for work breakdown structure and it ensures the identification of improved work packages. The process ensures the identification of the key activities aligning with the process for managing the activity levels.

First

Level

Second

level

Third

level

Fourth

Level

Description

1

SILT Containment

1.1

Contour & SITE SURVEY

2

BUILDING DESIGN

2.1

COLOUR CONSULTANT

2.2

ENERGY EFFICIENCY CERTIFICATE

3

ENGINEER

3.1

CONTRACTORS INSURANCE

3.1.1

Contractors Insurance for building

3.1.2

HOME WARRANTY INSURANCE

3.1.2.1

SAFETY AND HEALTH INSURANCE

4

4

COUNCIL FEES AND PERMITS

5

5

TOILET HIRE

5.1

HIRE

6

6

SITE EXCAVATION

7

7

RETAINING WALLS

8

8

SETTING OUT SURVEYOR HOUSE

9

9

SANDUP AND DETAILED EXCAVATION

9.1

CONCRETE PUMP

10

10

FOOTINGS HARDWARE

11

11

FOOTINGS CONCRETE

12

12

FOOTING LABOUR

13

13

ELECTRICIAN SITE WORKS

14

14

PLUMBER DRAINAGE

15

15

BEDDING SAND

15.1

SEDIMENT GRAVEL

16

16

TERMITE TREATMENT

16.1

SPOIL REMOVAL

17

17

SLAB HARDWARE

18

18

SLAB CONCRETE

19

19

SLAB LABOUR

20

20

BACKFILL POWER TRENCH

21

21

STICK FRAME IN LOWER FLOOR

21.1

FLOOR MATERIALS IN UPPER FLOOR

22

22

STICK FRAME IN UPPER FLOOR

23

23

T&G FLOORING

24

24

FRAME HARDWARE

24.1

CARPENTER BUILDING

25

25

ROOF TRUSSES

26

26

CARPENTER FRAME

27

27

GUTTERS AND FASCIA

27.1

DECK GUARD RAIL

28

28

CRANE HIRE

29

29

ROOF COVERING

30

30

WATERPROOFING

31

31

SPA BATHS AND BATHING

32

32

PLUMBERS ROUGH IN

33

33

ELECTRICAN

33.1

GAS CONNECTION

34

34

ALUMINIUM WINDOWS

35

35

DOOR LOCK EXTERNAL

36

36

JAMBS AND EXTERNAL DOORS

36.1

SITE CLEAN

37

37

HARDWARE LOCK AND SOFFIT SHEETS

38

38

SOFFITS AND CARPENTER LOCK

39

39

SCAFFOLDING

40

40

BRICKS

41

41

BRICK HARDWARE

42

42

BRICKLAYER

42.1

MASONARY ARTICULATION

43

43

INSULATION- WALL BATTS

44

44

CEILING LININGS AND WALL

45

45

GARAGE DOORS

46

46

DOOR KNOBS AND HARDWARE FINISHING

47

47

NTERNAL DOOR AND FINISHING TIMBER

48

48

INTERNAL STAIRS

49

49

CABINETMAKER

50

50

CARPENTER FIXOUT

51

51

WALL APPLICATIONS

52

52

CERAMIC TILES

52.1

CERAMIC TILES IN NON-WET AREA

53

53

CERAMIC TILER

54

54

SHOWER SCREENS

55

55

SANITARY WARE

55.1

PLUMBERS FIT OFF

56

56

PAINTER

57

57

WHITE GOODS

58

58

LIGHT FITTINGS

59

59

CURTAINS AND SHUTTER

60

60

TV ANTENA

61

61

POLISHING AND FLOOR SANDING

62

62

METAL FENCING

63

63

CONCRETOR EXTERNA

63.1

CONCRETE HARDWARE EXTERNA

64

64

EXTERNAL CONCRETE

65

65

CONCRETE SAND EXTERNAL

66

66

CONCRETE MACHINE HIRING

67

67

FINAL FIX CARPENTER

68

68

HOT WATERING SYSTEM

69

69

SECURITY SCREENS

70

70

INSULATION

71

71

HOUSE CLEAN

72

72

FINAL SITE CLEANING

73

73

LANDSCAPE

73.1

74

74

GARDEN EDGING

75

75

FLOOR COVERINGS

76

76

FENCING

77

77

CLOTHS HOISTS

78

78

ESTIMATING

79

79

THEFT AND CONTINGENCY

80

80

WINDOW SERVICE

81

81

PLUMBING APPROVAL

82

82

MAINTENANCE

83

83

POWER USAGE

From the above table it can be found that the WBS dictionary has included the task and subtask of the project and every task schedule which will take place for the project. Here, the dictionary will also the principle task and the sub task that will be mentioned one by one where it will be evaluated which subtask is allocated in which main task.

1.3 Activity List

Task Name

Duration

Start

Finish

Predecessors

Cost

SILT Containment

3 days

Tue 9/1/20

Thu 9/3/20

$1,930.00

Contour & SITE SURVEY

3 days

Tue 9/1/20

Thu 9/3/20

$1,710.00

BUILDING DESIGN

3 days

Tue 9/1/20

Thu 9/3/20

$4,850.00

COLOUR CONSULTANT

1 day

Tue 9/1/20

Tue 9/1/20

$500.00

ENERGY EFFICIENCY CERTIFICATE

1 day

Thu 9/3/20

Thu 9/3/20

$850.00

ENGINEER

5 days

Fri 9/4/20

Thu 9/10/20

2

$9,042.50

CONTRACTORS INSURANCE

5 days

Fri 9/4/20

Thu 9/10/20

$7,137.50

Contractors Insurance for building

1 day

Fri 9/4/20

Fri 9/4/20

$0.00

HOME WARRANTY INSURANCE

5 days

Fri 9/4/20

Thu 9/10/20

$3,287.50

1 day

Fri 9/4/20

Fri 9/4/20

$0.00

SAFETY AND HEALTH INSURANCE

3 days

Tue 9/8/20

Thu 9/10/20

$1,347.50

COUNCIL FEES AND PERMITS

5 days

Mon 9/7/20

Fri 9/11/20

$3,649.64

TOILET HIRE

2 days

Mon 9/7/20

Tue 9/8/20

$1,160.00

HIRE

2 days

Mon 9/7/20

Tue 9/8/20

$200.00

SITE EXCAVATION

2 days

Mon 9/7/20

Tue 9/8/20

$650.00

RETAINING WALLS

3 days

Mon 9/7/20

Wed 9/9/20

$5,204.84

SETTING OUT SURVEYOR HOUSE

1 day

Tue 9/8/20

Tue 9/8/20

$475.00

SANDUP AND DETAILED EXCAVATION

1 day

Tue 9/1/20

Tue 9/1/20

$2,578.55

CONCRETE PUMP

1 day

Tue 9/1/20

Tue 9/1/20

$1,200.00

FOOTINGS HARDWARE

1 day

Tue 9/1/20

Tue 9/1/20

$1,485.99

FOOTINGS CONCRETE

1 day

Tue 9/1/20

Tue 9/1/20

$3,191.31

FOOTING LABOUR

1 day

Tue 9/1/20

Tue 9/1/20

$1,572.00

ELECTRICIAN SITE WORKS

1 day

Tue 9/1/20

Tue 9/1/20

$1,001.50

PLUMBER DRAINAGE

1 day

Tue 9/1/20

Tue 9/1/20

$5,498.00

BEDDING SAND

1 day

Tue 9/1/20

Tue 9/1/20

$1,425.00

SEDIMENT GRAVEL

1 day

Tue 9/1/20

Tue 9/1/20

$300.00

TERMITE TREATMENT

1 day

Tue 9/1/20

Tue 9/1/20

$1,602.20

SPOIL REMOVAL

1 day

Tue 9/1/20

Tue 9/1/20

$200.00

SLAB HARDWARE

1 day

Tue 9/1/20

Tue 9/1/20

$2,834.93

SLAB CONCRETE

1 day

Tue 9/1/20

Tue 9/1/20

$4,703.05

SLAB LABOUR

1 day

Tue 9/1/20

Tue 9/1/20

$3,343.65

BACKFILL POWER TRENCH

1 day

Tue 9/1/20

Tue 9/1/20

$101.00

STICK FRAME IN LOWER FLOOR

1 day

Tue 9/1/20

Tue 9/1/20

$15,700.07

FLOOR MATERIALS IN UPPER FLOOR

1 day

Tue 9/1/20

Tue 9/1/20

$6,724.65

STICK FRAME IN UPPER FLOOR

1 day

Tue 9/1/20

Tue 9/1/20

$3,505.12

T&G FLOORING

1 day

Tue 9/1/20

Tue 9/1/20

$2,939.39

FRAME HARDWARE

1 day

Tue 9/1/20

Tue 9/1/20

$2,524.99

CARPENTER BUILDING

1 day

Tue 9/1/20

Tue 9/1/20

$329.76

ROOF TRUSSES

1 day

Tue 9/1/20

Tue 9/1/20

$8,831.05

CARPENTER FRAME

1 day

Tue 9/1/20

Tue 9/1/20

$8,696.95

GUTTERS AND FASCIA

1 day

Tue 9/1/20

Tue 9/1/20

$4,283.45

DECK GUARD RAIL

1 day

Tue 9/1/20

Tue 9/1/20

$1,790.25

CRANE HIRE

1 day

Tue 9/1/20

Tue 9/1/20

$450.00

ROOF COVERING

1 day

Tue 9/1/20

Tue 9/1/20

$12,455.85

WATERPROOFING

1 day?

Tue 9/1/20

Tue 9/1/20

$1,222.00

SPA BATHS AND BATHING

1 day

Tue 9/1/20

Tue 9/1/20

$239.00

PLUMBERS ROUGH IN

1 day

Tue 9/1/20

Tue 9/1/20

$3,089.90

ELECTRICAN

1 day

Tue 9/1/20

Tue 9/1/20

$6,638.05

GAS CONNECTION

1 day

Tue 9/1/20

Tue 9/1/20

$1,875.00

ALUMINIUM WINDOWS

1 day

Tue 9/1/20

Tue 9/1/20

$8,034.65

DOOR LOCK EXTERNAL

1 day

Tue 9/1/20

Tue 9/1/20

$339.30

JAMBS AND EXTERNAL DOORS

1 day

Tue 9/1/20

Tue 9/1/20

$1,695.50

SITE CLEAN

1 day

Tue 9/1/20

Tue 9/1/20

$800.00

HARDWARE LOCK AND SOFFIT SHEETS

1 day

Tue 9/1/20

Tue 9/1/20

$1,046.41

SOFFITS AND CARPENTER LOCK

1 day

Tue 9/1/20

Tue 9/1/20

$2,914.30

SCAFFOLDING

3 days

Wed 9/9/20

Fri 9/11/20

$6,200.00

BRICKS

3 days

Wed 9/9/20

Fri 9/11/20

$3,682.20

BRICK HARDWARE

1 day

Mon 9/14/20

Mon 9/14/20

57

$505.40

BRICKLAYER

1 day

Tue 9/1/20

Tue 9/1/20

$11,769.70

MASONARY ARTICULATION

1 day

Tue 9/1/20

Tue 9/1/20

$181.60

INSULATION- WALL BATTS

1 day

Wed 9/9/20

Wed 9/9/20

$654.91

CEILING LININGS AND WALL

1 day

Thu 9/10/20

Thu 9/10/20

61

$13,084.14

GARAGE DOORS

1 day

Wed 9/9/20

Wed 9/9/20

$2,094.46

DOOR KNOBS AND HARDWARE FINISHING

2 days

Thu 9/3/20

Fri 9/4/20

$729.80

INTERNAL DOOR AND FINISHING TIMBER

2 days

Thu 9/3/20

Fri 9/4/20

$2,188.80

INTERNAL STAIRS

4 days

Fri 9/4/20

Wed 9/9/20

1

$2,010.00

CABINETMAKER

4 days

Mon 9/7/20

Thu 9/10/20

65

$9,129.56

CARPENTER FIXOUT

4 days

Mon 9/7/20

Thu 9/10/20

64

$2,694.50

WALL APPLICATIONS

4 days

Mon 9/7/20

Thu 9/10/20

3

$960.00

CERAMIC TILES

2 days

Fri 9/11/20

Mon 9/14/20

7

$2,744.33

CERAMIC TILES IN NON WET AREA

2 days

Fri 9/11/20

Mon 9/14/20

69

$1,566.91

CERAMIC TILER

4 days

Tue 9/8/20

Fri 9/11/20

$4,847.90

JOINT TILE SEALING

4 days

Tue 9/8/20

Fri 9/11/20

$300.00

SHOWER SCREENS

4 days

Tue 9/8/20

Fri 9/11/20

$1,779.37

SANITARY WARE

1 day?

Fri 9/11/20

Fri 9/11/20

$4,167.23

PLUMBERS FIT OFF

1 day?

Fri 9/11/20

Fri 9/11/20

$3,101.23

PAINTER

5 days

Fri 9/11/20

Thu 9/17/20

9

$8,101.48

WHITE GOODS

5 days

Mon 9/7/20

Fri 9/11/20

$1,975.55

LIGHT FITTINGS

5 days

Mon 9/7/20

Fri 9/11/20

$1,575.68

CURTAINS AND SHUTTER

3 days

Tue 9/8/20

Thu 9/10/20

$1,636.60

TV ANTENA

3 days

Tue 9/8/20

Thu 9/10/20

$250.00

POLISHING AND FLOOR SANDING

2 days

Wed 9/9/20

Thu 9/10/20

13

$657.24

METAL FENCING

1 day

Fri 9/11/20

Fri 9/11/20

66

$2,700.00

CONCRETOR EXTERNAL

1 day

Fri 9/11/20

Fri 9/11/20

16

$5,192.00

CONCRETE HARDWARE EXTERNAL

1 day

Fri 9/11/20

Fri 9/11/20

82

$1,412.00

EXTERNAL CONCRETE

1 day

Fri 9/11/20

Fri 9/11/20

81

$3,098.80

CONCRETE SAND EXTERNAL

1 day

Fri 9/11/20

Fri 9/11/20

80

$562.50

CONCRETE MACHINE HIRING

1 day

Tue 9/15/20

Tue 9/15/20

70

$460.00

FINAL FIX CARPENTER

1 day

Fri 9/11/20

Fri 9/11/20

68

$404.18

HOT WATERING SYSTEM

1 day

Tue 9/1/20

Tue 9/1/20

$645.00

SECURITY SCREENS

1 day

Tue 9/1/20

Tue 9/1/20

$2,902.48

INSULATION

1 day

Tue 9/1/20

Tue 9/1/20

$1,498.05

HOUSE CLEAN

1 day

Tue 9/1/20

Tue 9/1/20

$808.35

FINAL SITE CLEANING

1 day

Mon 9/14/20

Mon 9/14/20

89

$500.00

LANDSCAPE

1 day

Wed 9/16/20

Wed 9/16/20

88

$3,740.00

LANDSCAPE PLANTS

1 day

Wed 9/16/20

Wed 9/16/20

87

$2,500.00

GARDEN EDGING

1 day

Mon 9/14/20

Mon 9/14/20

86

$201.00

FLOOR COVERINGS

3 days

Wed 9/9/20

Fri 9/11/20

14

$2,475.00

FENCING

3 days

Wed 9/9/20

Fri 9/11/20

15

$2,875.00

CLOTHS HOISTS

3 days

Wed 9/9/20

Fri 9/11/20

17

$211.00

ESTIMATING

1 day

Tue 9/15/20

Tue 9/15/20

100

$915.75

THEFT AND CONTINGENCY

1 day

Tue 9/15/20

Tue 9/15/20

99

$1,500.00

WINDOW SERVICE

1 day

Tue 9/15/20

Tue 9/15/20

98

$123.77

PLUMBING APPROVAL

1 day

Tue 9/15/20

Tue 9/15/20

85

$266.20

MAINTENANCE

1 day

Tue 9/15/20

Tue 9/15/20

84

$455.00

POWER USAGE

1 day

Tue 9/15/20

Tue 9/15/20

83

$160.00

From the above table the project activity as per their name and description has been mentioned. In this work schedule the activities has been taken place one by one. In this section, the predecessors have been given with the activity list. The duration of activities also been given where some of them has started early and been completed within a couple of days while some of them are been completed with a few days.

Bibliography for Development of Cost Engineering System

Al-Zwainy, F. M. S., Amer, R., & Khaleel, T. (2016). Reviewing of the simulation models in cost management of the construction projects. Civil Engineering Journal2(11), 607-622.

Chitongo, A. M., & Pretorius, L. (2018). Client project time schedule controls-An empirically-based system dynamics conceptual model. South African Journal of Industrial Engineering29(1), 169-183.

Didkovskaya, O. V., Mamayeva, O. A., & Ilyina, M. V. (2016). Development of cost engineering system in construction. Procedia Engineering153, 131-135.

Gbahabo, P. T., & Ajuwon, O. S. (2017). Effects of project cost overruns and schedule delays in Sub-Saharan Africa. European Journal of Interdisciplinary Studies3(2), 46-59.

Guo, Y. T., Yang, S. T., Wang, L., & Luo, S. J. (2016). Project progress measurement under the circumstance of interrupted schedule. Filomat30(15), 4037-4048.

Halou, M., Samin, R., & Ahmad, M. (2019). Impacts of change management on risk and cost management of a construction projects. Journal of Project Management4(2), 157-164.

Izmailov, A., Korneva, D., & Kozhemiakin, A. (2016). Project management using the buffers of time and resources. Procedia-Social and Behavioral Sciences235, 189-197.

Li, X., Xu, J., & Zhang, Q. (2017). Research on construction schedule management based on BIM technology. Procedia engineering174, 657-667.

Salem, D., Bakr, A., & El Sayad, Z. (2018). Post-construction stages cost management: Sustainable design approach. Alexandria engineering journal57(4), 3429-3435.

Wolken-Möhlmann, G., Bendlin, D., Buschmann, J., & Wiggert, M. (2016). Project schedule assessment with a focus on different input weather data sources. Energy Procedia94, 517-522.

Remember, at the center of any academic work, lies clarity and evidence. Should you need further assistance, do look up to our Management Assignment Help

Explore More on This Topic :

CIV5306 Road Safety Engineering Assessment New Analysis Assignment Sample

Hey MAS, I need Assignment Sample of

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+
  • 1,212,718Orders

  • 4.9/5Rating

  • 5,063Experts

Highlights

  • 21 Step Quality Check
  • 2000+ Ph.D Experts
  • Live Expert Sessions
  • Dedicated App
  • Earn while you Learn with us
  • Confidentiality Agreement
  • Money Back Guarantee
  • Customer Feedback

Just Pay for your Assignment

  • Turnitin Report

    $10.00
  • Proofreading and Editing

    $9.00Per Page
  • Consultation with Expert

    $35.00Per Hour
  • Live Session 1-on-1

    $40.00Per 30 min.
  • Quality Check

    $25.00
  • Total

    Free
  • Let's Start

Get
500 Words Free
on your assignment today