This assignment is related to ” Traffic Engineering” and experts at Grade Saviours successfully delivered HD quality work within the given deadline.
The site is currently predominantly cleared land. It is proposed to realign North Creek Road through the subject site, with Hutley Drive extended to intersect with North Creek Road via a four leg roundabout. Henderson Lane will also be realigned to intersect with North Creek Road via a new T junction, to the west of Stoneyhurst Drive. The proposed site layout, shown below, is also provided
It is assumed that the development will be completed in 2020. A future planning horizon of 10 years from the date of completion should be considered. The impact of the development at the development completion year and at the planning horizon should be assessed.
For each scenario, analyse the operation of the two intersections, Hutley Drive/New North Creek Rd and The Coast Rd/Ballina St/New North Creek Rd, in the AM and PM peak hour. Note that the Hutley Drive/New North Creek Rd is only required to be analysed for the scenarios with the development, as this roundabout will only be constructed as part of the
development. If the operation of any existing or proposed intersection is unacceptable, recommendations to achieve acceptable operation (which have been tested in SIDRA) should be included. Thus the report should include details of the form and lane configurations of the intersections at Hutley Drive/New North Creek Rd and The Coast Rd/Ballina St/New North
Creek Rd intersections that should be constructed.
The following assumptions apply to the proposed development traffic:
• A directional distribution of development traffic to/from north or south of 50% and 50% respectively. The directional distributions described apply to AM and PM peak volumes, both entering and exiting the development.
• For the development traffic to/from the north, 60% are assumed to use The Coast Rd (i.e. left turn on The Coast Rd for exiting traffic), and 40% assumed to use Ballina Rd (i.e. through movement onto Ballina Rd for exiting traffic).
• For the development traffic to/from the south, 25% are assumed exit the
development to the south (i.e. not use the to use The Coast Rd/Ballina St/New North Creek Rd intersection) and utilise Skennars Head Rd, while the remaining 75% are assumed to use The Coast Rd/Ballina St/New North Creek Rd intersection (i.e. left turn onto The Coast Rd for exiting traffic).
• Assume a split for the trip ends for the development of 20% in and 80% out in the AM peak and a 70% in and 30% out in the PM peak.
The following assumptions apply to the background traffic:
• An annual growth of 2% for the existing (background) traffic.
• When distributing the background (existing) volumes at the new Hutley Drive/New North Creek Rd intersection, assume 1/3 from the east (i.e. via the new Hutley Rd connection) and 2/3 from the south (i.e. via the New North Creek Rd). The following are provided on MySCU Blackboard to enable the assessment:
• RTA Guide to Traffic Generating Developments
• AM and PM peak hour turning movements counts for the current The Coast
Road/North Creek Road/Ballina Street intersection conducted in March 2013
• The proposed site plan for the development
• The marking criteria
The outcome of the traffic assessment is to be submitted via MySCU Blackboard is a Traffic
Impact Assessment. The report must be more than 10 pages in length (excluding appendices) with an appropriate report structure, including SIDRA results, title pages, tables of contents, references, conclusions and recommendations etc. All assumptions should be well documented in the report, and the traffic volumes for each scenario must be included.
Appropriate inclusions and structures of Traffic Impact Assessments were discussed in lectures, with a sample Traffic Impact Assessment provided for information. Use this as a guide only not as a definitive template.
These assignments are solved by our professional Traffic Engineeringat Grade Saviours and the solution are high quality of work as well as 100% plagiarism free. The assignment solution was delivered within 2-3 Days. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
The proposal is for a residential land of 149 lots with an integrated 30 housing lots. Currently the site is a clear land. Proposal has been made to realign North Creek Road through the subject site; Hutley Drive will be extended to intersect with North Creek Road via a four leg roundabout. Henderson Lane will also be realigned to intersect with North Creek Road via a new T junction, to the west of Stoneyhurst Drive. The proposed site layout is as shown in figure 2.
The Coast Road is a part of north-south major route between Byron Bay and Ballina and has two traffic lanes. The posted speed limit near North Creek Road is 60km/hr. North Creek Road is also a two lane road with a speed limit of 60km/hr. Hutley Drive currently connects the concerned site and Henderson Lane and has a speed limit of 50km/hr. Henderson Lane is a two lane road with a pavement width of approximately 7 m and a speed limit of 50 km/hr. The intersection of the Coast Road, North Creek Road and Ballina Street is regulated by a two lane circulating roundabout. Figures 3 shows the road network and its surrounding interactions.
In March 2013 traffic counts were conducted at the Coast Road, North Creek Road and Ballina Street. Figure 4 summaries these results.


The following traffic generation and distribution characteristics have been adopted:
Table 1: Adopted Traffic Demand and Distribution Values
| Description | Adopted Value | |
| Traffic Generation (Peak Hour) | 0.9 trips per lot | |
| In / Out Split | AM Peak Hour | 20% in / 80% out |
| PM Peak Hour | 70% in / 30% out | |
| Traffic Distribution | 50% to the north 50% to the south | |
| Component | Morning Peak Hour | Afternoon Peak Hour | ||||
| Residential (179 dwellings) | In | Out | Total | In | Out | Total |
| 32 | 129 | 161 | 113 | 48 | 161 | |
As per Cardno Eppell Olsen assessment, it is assumed that the majority (75%) of southbound traffic will utilize The Coast Road / North Coast Road / Ballina Street roundabout and only a limited percentage (25%) will use Skennars Head Road via north Coast Road.
Figure 6 shows the estimates of development traffic volumes at The Coast Road / North Coast Road / Ballina Street roundabout.
The traffic inferences of development proposals primarily concern the effects that any additional traffic flows may have on the operational performance of the nearby road network. SIDRA program can assess these effects. For this assessment, a capacity analysis has been done using the data during the critical afternoon peak period of The Coast Road / North Creek Road and Ballina Street intersection.
The intersection has been modeled under current and projected future (year 2024) traffic conditions, without and with the proposed development. The intersection geometry is shown in Figure 7. Detailed results of the SIDRA analysis is provided in Appendix I and summarized below.
Table 3: SIDRA Results – The Coast Road / North Creek Road & Ballina Street Intersection
| Scenario | Level of Service | Degree of Saturation | Total Average Vehicle Delay (sec) | 95th Percentile Queue Length (m) |
| AM 2013 without development | A | 0.378 | 9.2 | 15.1 |
| AM 2013 with development | A | 0.402 | 9.5 | 16.3 |
| AM 2024 without development | A | 0.506 | 9.9 | 25.0 |
| AM 2024 with development | B | 0.537 | 10.5 | 28.2 |
| PM 2013 without development | A | 0.470 | 9.6 | 21.9 |
| PM 2013 with development | B | 0.512 | 10.1 | 25.9 |
| PM 2024 without development | B | 0.696 | 12.3 | 58.0 |
| PM 2024 with development | B | 0.759 | 13.6 | 73.9 |

It is proposed that the existing North Creek Road will terminate within the new residential estate and thus the new North Creek Road will become the priority road.
Find Solution for Traffic Engineering by dropping us a mail at help@gradesaviours.com along with the question’s URL. Get in Contact with our experts at Grade Saviours and get the solution as per your specification & University requirement.
1,212,718Orders
4.9/5Rating
5,063Experts
Turnitin Report
$10.00Proofreading and Editing
$9.00Per PageConsultation with Expert
$35.00Per HourLive Session 1-on-1
$40.00Per 30 min.Quality Check
$25.00Total
FreeGet
500 Words Free
on your assignment today
Get
500 Words Free
on your assignment today
Request Callback
Doing your Assignment with our resources is simple, take Expert assistance to ensure HD Grades. Here you Go....
Speak directly with a qualified subject expert.
Get clarity on your assignment, structure, and next steps.
In this free session, you can: